This box is installed near the machine room door at 120 to 140 cm height, from the floor, using 4 bolts and rawlplugs. The elevator power is supplied using a 5-cord cable from a collective electricity meter. Is there not? Has this changed OR should I be looking in the, in this case MA, elevator code for. Three-phase elevator box is installed in the latest step of the process in the elevator machine room. The elevator will be out of service if electric power is not supplied. Each car, machine room and hoistway pit must have separate dedicated branch circuits for lighting, receptacles and HVAC, with car and machine-room lighting exempt from GFCI while required for receptacles. Overcurrent devices and disconnects must be located in machine or control spaces, be lockable. Dry Power Units, travel and various other circumstances may require larger or smaller machine room sizes. Please consult your MEI representative for specific situation. It supplies the power, direction, and safety functions that keep passengers moving between floors.
[PDF Version]